Who we are
Our strength lies in our people united as an integrated team with one mission that sets us apart from the competition.
Marine
We provide one-source solutions for projects above and below, on and off the water.
Concrete
Achieving high customer satisfaction, repeat business through consistent project management, quality work, and cost-effective completion.
Engineering
Schneider Engineering & Consulting excels in marine and civil engineering, delivering unparalleled solutions for diverse projects.
Orion took on a challenging project in the Kenai Mountains, Alaska, enhancing power generation by 10% through the construction of three miles of roadway and two miles of High-Density Polyethylene (HDPE) pipeline. The project showcased our expertise in overcoming logistical challenges for successful and timely completion.
Orion secured a contract with the Alaska Energy Authority to construct three miles of new roadway, two miles of High-Density Polyethylene (HDPE) pipeline, and the West Upper Battle Creek Diversion structures in the Kenai Mountains, situated 1,500 feet above Kachemak Bay near Homer, Alaska. The ambitious project aimed to boost the creek's flow into the Bradley Lake Reservoir, thereby increasing power generation at the Bradley Lake Powerhouse by 10%.
The project's primary components included the HDPE pipeline with its 450-linear-foot (LF), 96-inch-diameter intake structure, linking to 8,400 LF of 63-inch-diameter HDPE transmission pipeline, and a 350-LF, 84-inch-diameter outfall structure. In a move to enhance efficiency, Orion subcontracted GMC, importing the world's largest HDPE fusion machine for welding the 80-foot-long pieces. These components were then transported approximately 10 miles from the storage yard up the mountain to the project site for installation.
The project also entailed capping off the diversion dam, installing pressure relief valves, creating concrete pipe easements, erecting ECO block walls, implementing electrical controls, and completing backfilling. Much of this work occurred concurrently along the route, provide for a safe, successful, and on-time completion of the project.
Orion marine
Orion played a crucial role in the NRD Habitat Restoration at Vigor Shipyard in Seattle. Our work included demolition of several structures, reconstructing a new pier section, new stormwater system...
This project includes replacement of the existing bridges over the Indian River going into Kennedy Space Center, due to structural deficiencies and the necessity for the safe and efficient movement of...
In the Galveston Harbor project, our Dredge King Fisher deepened the channel to -50 feet, raised levees in Pelican Island DMPA (Phase #1), and improved San Jacinto DMPA levees (Phase #2)...
Explore Orion's success on the Eagleford Pipeline project, where we installed 2.2 miles of 16-inch pipeline in Corpus Christi, Texas. With advanced Horizontal Directional Drilling (HDD), precise...