Who we are
Our strength lies in our people united as an integrated team with one mission that sets us apart from the competition.
Marine
We provide one-source solutions for projects above and below, on and off the water.
Concrete
Achieving high customer satisfaction, repeat business through consistent project management, quality work, and cost-effective completion.
Engineering
Schneider Engineering & Consulting excels in marine and civil engineering, delivering unparalleled solutions for diverse projects.
Explore our Engineering & Consulting team's featured projects, showcasing our expertise in marine structures, civil engineering, and environmental solutions. Each project demonstrates our commitment to innovative design, sustainable practices, and client-focused solutions.
Orion Engineering
With steel pipe pile-supported foundations, this Golden Pass LNG Flood Gate design included 30ft and 60ft gates, steel sheet piles as a protective curtain, and an anchored bulkhead wall linking to the...
Orion Engineering & Consulting led a Design/Build effort for a 100% design and construction of a fender system at the KCS railway bridge in Beaumont. The design featured robust steel assemblies with...
Orion was enlisted by the Florida Department of Transportation to replace the existing 1964 bascule bridge over the Indian River, crucial for SpaceX and Blue Origin launches. Our Engineering &...
Orion collaborated with the Port Authority of Jamaica to introduce the SEAWALK® System at Kingston Harbor's Port Royal, a "World Heritage Site." The project, fast-tracked to meet schedule demands...
Bermello Ajamil & Partners enlisted Orion for a peer review of Port Everglades Turning Notch project in Fort Lauderdale. Our team assessed design, schedule, cost estimate, and excavation alternatives,...
Argos USA LLC engaged Schneider Engineering and Consulting (SEC) to inspect and assess their Tampa waterfront structures. Our engineers used innovative real-time footage during underwater inspections,...
In 2018, Orion inspected OxyChem's Mississippi River facility for acquisition feasibility. Topside and underwater assessments, quick reporting, and repair cost estimates were provided within one month...
In 2017, BVIPA hired Orion to assess Tortola Cruise Pier post-Hurricanes Maria and Irma. Swift inspection revealed minimal damage, with a lost walkway. Our engineers followed ASCE standards...
Extending the pier to host Royal Princess Class and smaller vessels, the 520ft access bridge and 486ft-wide main pier promise a 50-year design life. With concrete structures, mooring dolphins, and...
Our team managed the rehabilitation of a 37-year-old seawall, addressing issues like corrosion, sheet pile damage, and inadequate fendering. Design solutions included an encapsulation cap, new...
Targa Dock 4 and Dock 2's in Galena Park, Texas was engineered with precise marine structures design. Dock 4, on the trestle's south side, featured a pile-supported concrete dock for vessels up to...