Orion assisted Great Lakes Dredge and Dock Company (GLDD) in the U.S. Army Corps of Engineers (USACE) Freeport Bend Easing project, excavating 30,000 cubic yards for a pilot cut channel; placing 16,000 square yards of geotextile fabric; and installing 17,000 tons of granite riprap for slope armoring. Despite significant material supply delays, Orion's skilled team completed the work on time, fostering a positive relationship with GLDD for future collaboration.
Orion undertook a pivotal role on the Freeport Bend Easing contract in collaboration with Great Lakes Dredge and Dock Company (GLDD) and the U.S. Army Corps of Engineers (USACE) in Freeport, Texas. Our scope encompassed diverse tasks, including the excavation of approximately 30,000 cubic yards of material to create a pilot cut channel for GLDD's dredging operations. Additionally, we were responsible for placing 16,000 square yards of geotextile fabric and installing 17,000 tons of granite riprap for slope armoring.
Facing significant material supply challenges before construction, our experienced team addressed the issue head-on. Despite the delays, we successfully completed the work on schedule with no negative impacts on the client. Throughout the project, we not only fulfilled our contractual obligations but also built a strong relationship with GLDD. This collaboration sets the stage for future partnerships, and we are excited about contributing to the continued growth and success of our endeavors.
Orion marine
Orion played a crucial role in the NRD Habitat Restoration at Vigor Shipyard in Seattle. Our work included demolition of several structures, reconstructing a new pier section, new stormwater system...
This project includes replacement of the existing bridges over the Indian River going into Kennedy Space Center, due to structural deficiencies and the necessity for the safe and efficient movement of...
In the Galveston Harbor project, our Dredge King Fisher deepened the channel to -50 feet, raised levees in Pelican Island DMPA (Phase #1), and improved San Jacinto DMPA levees (Phase #2)...
Explore Orion's success on the Eagleford Pipeline project, where we installed 2.2 miles of 16-inch pipeline in Corpus Christi, Texas. With advanced Horizontal Directional Drilling (HDD), precise...