Orion’s Engineering & Consulting group served as the Engineer of Record on this Design-Build project in Ocho Rios, Jamaica. Port Royal Cruise Pier boasts an innovative floating SeaWalk – the first of its kind in the Caribbean. Orion constructed the facility, including steel pile-supported elements, wooden deck, 200T bollards, and a sea walk. The project was built in the vicinity of the historic “Sunken City of Royal,” which has been declared a World Historic Heritage Site by UNESCO.
Orion successfully designed and constructed this new cruise pier in Port Royal, marking a significant milestone as the first cruise facility in the entire Caribbean to adopt the innovative floating retractable Cruise Pier developed by SeaWalk. The scope of work included the construction of essential components to support the SeaWalk, such as the steel pile-supported concrete head section, steel pile-supported trestle with concrete caps, a wooden deck with handrails, shore-side 200T bollards anchored to a 36” steel pile, a concrete abutment wall, and a 36” pile-supported SeaWalk carriage rest.
The project's strategic location near the Historic "Sunken City of Royal," a UNESCO World Historic Heritage Site, added a layer of complexity to the construction process. Orion navigated this challenge with precision and care, respecting the cultural and historical significance of the surroundings.
Orion's Engineering & Consulting group played a vital role as the Engineer of Record, contributing expertise to successfully deliver this project. The completion of this groundbreaking cruise pier in Port Royal stands as a testament to our commitment to innovation and excellence in marine construction projects.
Orion marine
Orion played a crucial role in the NRD Habitat Restoration at Vigor Shipyard in Seattle. Our work included demolition of several structures, reconstructing a new pier section, new stormwater system...
This project includes replacement of the existing bridges over the Indian River going into Kennedy Space Center, due to structural deficiencies and the necessity for the safe and efficient movement of...
In the Galveston Harbor project, our Dredge King Fisher deepened the channel to -50 feet, raised levees in Pelican Island DMPA (Phase #1), and improved San Jacinto DMPA levees (Phase #2)...
Explore Orion's success on the Eagleford Pipeline project, where we installed 2.2 miles of 16-inch pipeline in Corpus Christi, Texas. With advanced Horizontal Directional Drilling (HDD), precise...