Marine
We provide one-source solutions for projects above and below, on and off the water.
Concrete
Achieving high customer satisfaction, repeat business through consistent project management, quality work, and cost-effective completion.
Engineering
Schneider Engineering & Consulting excels in marine and civil engineering, delivering unparalleled solutions for diverse projects.
Targa Dock 4 and Dock 2's in Galena Park, Texas was engineered with precise marine structures design. Dock 4, on the trestle's south side, featured a pile-supported concrete dock for vessels up to 750’ LG 64,000 DWT. Demolishing part of Targa Dock, including dock 2A, and redesigning the approach, Orion created a functional space with breasting and mooring capabilities. The rebuilt approach now serves as a parking area for both dock 2 and the new dock 4.
Orion’s Engineering & Consulting team played a crucial role in providing comprehensive marine structures engineering design and coordination services for the development of Dock 4 and the approach way of Dock 2, strategically positioned along the Houston Ship Channel in Galena Park, Texas. The project encompassed the construction of a new Dock 4 on the south side of the trestle, involving dredging activities to achieve elevation -40.0ft. This new construction featured a meticulously designed pile-supported concrete dock with an elevated steel platform, emphasizing robustness and durability.
The engineering design was intricately crafted to accommodate breasting and mooring requirements for vessels up to a 750ft LG 64,000 DWT design. The dock's functionality was further enhanced with provisions for two 16”ø loading arms, designed to accommodate future 12”ø additions, and a robust 20T deck-mounted pedestal crane, contributing to its versatility and operational efficiency.
Additionally, the project entailed the strategic demolition of the eastern end of the Targa Dock, incorporating the removal of dock 2A and the existing approach. Designated breasting and mooring dolphins were systematically dismantled. A noteworthy aspect of the endeavor was the reconstruction of a segment at the end of the existing approach, transformed into a pile-supported concrete deck parking area. This revitalized space catered to the needs of both the existing Dock 2 and the newly established Dock 4, reflecting a meticulous approach to optimizing the utility and functionality of the maritime infrastructure. The entirety of these endeavors underscored our commitment to delivering innovative and effective solutions in the dynamic realm of marine structures engineering.
Orion Engineering
With steel pipe pile-supported foundations, this Golden Pass LNG Flood Gate design included 30ft and 60ft gates, steel sheet piles as a protective curtain, and an anchored bulkhead wall linking to the...
Orion Engineering & Consulting led a Design/Build effort for a 100% design and construction of a fender system at the KCS railway bridge in Beaumont. The design featured robust steel assemblies with...
Orion was enlisted by the Florida Department of Transportation to replace the existing 1964 bascule bridge over the Indian River, crucial for SpaceX and Blue Origin launches. Our Engineering &...
Orion collaborated with the Port Authority of Jamaica to introduce the SEAWALK® System at Kingston Harbor's Port Royal, a "World Heritage Site." The project, fast-tracked to meet schedule demands...